When investing in made-to-measure curtains, one of the most common questions is: "How long will they take to arrive?" Understanding the timeline helps you plan your interior project effectively and set realistic expectations. This comprehensive guide walks you through each stage of the made-to-measure curtain process, from initial measurements to final installation.
The Quick Answer
Typically, made-to-measure curtains take 2-4 weeks from order to delivery, depending on fabric availability, complexity of design, customisation options, and peak seasonal demand. Premium or bespoke designs may take longer.
Detailed Timeline Breakdown
Stage 1: Measurement & Consultation (1-7 days)
Before placing your order, accurate measurements are crucial. You have two options:
DIY Measurement (1 day)
- Take measurements yourself using our online measurement guide
- Submit measurements through our website
- Receive immediate order confirmation
Professional Measurement Service (3-7 days)
- Schedule an appointment with a professional measurer
- Receive expert advice on styles, headings, and fabric options
- Finalise measurements and design choices
Pro Tip: Even if measuring yourself, request fabric samples first. This can add 2-3 days but ensures you're completely satisfied with your choice before committing.
Stage 2: Order Processing & Fabric Sourcing (2-10 days)
Once measurements are confirmed, your order enters processing:
- Order verification: 1-2 days for our team to review measurements and specifications
- Fabric sourcing: 1-8 days depending on availability
- In-stock fabrics: 1-2 days
- Special order fabrics: 5-8 days
- Designer or imported fabrics: up to 10 days
Common Delay Factors:
- Limited edition or designer collections
- Seasonal patterns with high demand
- Custom dye requirements
- International shipping for specialty fabrics
Stage 3: Production & Crafting (10-21 days)
This is where your curtains take shape:
- Pattern cutting: 1-2 days
- Sewing & assembly: 7-14 days depending on complexity
- Finishing touches: 2-5 days (linings, headings, trims, etc.)
Timeline Variables:
- Standard curtains: 10-14 days
- Complex designs: 14-21 days
- Additional features adding time:
- Interlining: +2-3 days
- Hand-finished details: +3-5 days
- Pattern matching: +1-3 days
- Extra-large sizes: +2-4 days
Stage 4: Quality Control & Packaging (1-3 days)
Before dispatch, each curtain undergoes:
- Thorough inspection for stitching quality
- Pattern alignment verification
- Header and lining checks
- Careful pressing to remove wrinkles
- Protective packaging to prevent transit damage
Stage 5: Delivery & Installation (1-7 days)
The final stage brings your curtains home:
- Standard delivery: 3-5 working days
- Express delivery: 1-2 working days (additional cost)
- International delivery: 5-7 working days
Installation Options:
- DIY installation: Immediate once delivered
- Professional installation service: Schedule within 7 days of delivery (separate booking)
Tips to Expedite Your Order
- Order during off-peak seasons (avoid November-December and April-May)
- Choose in-stock fabrics rather than special order materials
- Opt for standard heading styles like pencil pleat or eyelet
- Confirm measurements promptly to avoid processing delays
- Consider express production options (additional fee may apply)
Planning Your Timeline
For special occasions or renovation projects, we recommend working backwards:
- Required installation date - 6 weeks = Ideal ordering date
- Add an extra 1-2 weeks during peak seasons
- For urgent requirements, enquire about rush order options
Common Questions
Q: Can I expedite my order? A: Yes, rush services are available for an additional fee, typically reducing the timeline by 30-40%.
Q: What causes the most significant delays? A: Fabric availability and custom design elements typically cause the longest delays.
Q: How will I know when my curtains will arrive? A: You'll receive progress updates throughout the production process, with delivery confirmation and tracking provided before dispatch.
Q: Do lined curtains take longer? A: Yes, adding standard lining typically adds 2-3 days, while thermal or blackout linings may add 3-4 days to production.
In Conclusion
Made-to-measure curtains are worth the wait, offering superior fit, finish and longevity compared to ready-made alternatives. While the process takes time, the result is bespoke window dressings perfectly suited to your space. For the most accurate timeline estimate for your specific requirements, use our online ordering system or speak with our customer service team.